Downloadable commercial furniture resource

Restaurant Table Size and Base Coordination Chart

This is a coordination worksheet, not a universal capacity chart. Chair width, service style, place settings, bases, and circulation change the answer.

Open the worksheet →

Immediate guidance

What a completed decision should establish.

Table size alone does not establish capacity. The top, base, chair, place setting, service pattern, occupied footprint, and accessible condition must be coordinated together.

01

Confirm the top and base as one assembly

Record top dimensions and thickness, mounting pattern, base model or spread, column location, glides, and supported size.

02

Test the real place setting

Chair width, shared plates, menus, lamps, condiments, service style, and table-turn expectations change usable top area.

03

Protect accessible dining surfaces

Where the 2010 ADA Standards apply, the dining or work surface must meet the applicable height, knee-clearance, clear-floor, and approach requirements. The qualified project team must verify the final layout.

Complete this worksheet in the browser, download the CSV, or print a working copy.

Top sizeProposed seatsTop materialBase model or spreadMount patternAccessible conditionSupplier confirmed

How to use the worksheet

Turn blank fields into controlled decisions.

Confirm the pairing

The top supplier and base supplier should confirm mounting, stability, and supported size together.

Test the setting

Place settings, shared plates, menus, lamps, and service style affect usable top area.

Protect knee space

Base geometry and decorative aprons can obstruct an otherwise correctly sized surface.

Supplier directories

Move from the worksheet to a qualified supplier set.

Restaurant furniture suppliersOpen directory →Restaurant seating and table suppliersOpen directory →Outdoor furniture suppliersOpen directory →

Need a furniture quote?

Send the completed worksheet or your existing project list.

The sourcing team can help turn quantities, specifications, finishes, delivery conditions, and timing into a supplier-ready request.

Human reply within 1–2 business days. No automated sales sequence.