Hotel Model Room Approval Checklist

A model room is valuable only when its observations become controlled decisions that update specifications and production documents.

Open the worksheet →

Immediate guidance

What a completed decision should establish.

A model room is valuable only when its observations become controlled decisions that update specifications and production documents.

The qualified project team must verify applicable accessibility requirements on the final project plan.

01

Test the interfaces

Review furniture with lighting, power, equipment, wall finishes, doors, and housekeeping access in place.

02

Separate room types

One mockup may not resolve every suite, accessible, connecting, or handed condition.

03

Close before release

Each accepted change should reach drawings, specifications, pricing, and production records.

Complete this worksheet in the browser, download the CSV, or print a working copy.

Review areaObservationRequired changeOwnerDue dateClosed byRelease effect
Furniture fit and circulation
Edit label
Bed, nightstand, lighting, and power
Edit label
Desk, seating, and work surface
Edit label
Casegoods and equipment interfaces
Edit label
Housekeeping and maintenance access
Edit label
Accessible conditions
Edit label
Finish and workmanship
Edit label
Packaging and installation sequence
Edit label

Completed worksheet entry

Worked example: resolve a bedside-power conflict

A filled entry can still record an open issue. This example makes the correction, evidence and production hold explicit so that an observation does not disappear into a general approval.

Illustrative entry for a fictional standard king room. No real inspection or approval is represented.
Worksheet fieldExample entry
Review areaBed, nightstand, lighting, and power
ObservationThe nightstand back covers the bedside outlet. The lamp plug cannot be reached with the furniture in its intended position.
Required changeRevise the nightstand back detail and dimension the outlet access on the shop drawing. Recheck the revised mockup with the lamp and cables in place.
OwnerDesign lead, coordinating the furniture supplier and electrical designer.
Due date19 October 2026, before final casegoods shop-drawing sign-off.
Closed byPending the designated reviewer’s dated recheck, annotated photograph and accepted drawing revision.
Release effectHold production of the affected nightstand configuration until the correction is verified and the revised drawing is issued.

Acceptance checks before closing this entry

Confirm that the plug is accessible with the nightstand in position, drawer travel remains clear, and the cable is not pinched. Compare the corrected mockup with the revised dimensioned drawing and record the photograph and revision identifier in the log. Refer any electrical change to the project’s qualified electrical reviewer.

The designated reviewer should record their name, the date and the evidence before lifting this hold. Carry the accepted detail into the supplier’s production documents, and identify which room types use it. Other room layouts, accessible conditions and unrelated open issues still need their own review.

Supplier directories

Move from the worksheet to a qualified supplier set.

Hospitality furniture suppliersOpen directory →Beds and headboard suppliersOpen directory →Casegoods and storage suppliersOpen directory →

Need a furniture quote?

Send the completed worksheet or your existing project list.

The sourcing team can help turn quantities, specifications, finishes, delivery conditions, and timing into a supplier-ready request.

Human reply within 1–2 business days. No automated sales sequence.